Commercial Electrical
Client
Daniel Whitfield
Duration
06 Months
Services
Commercial
Date
July 30, 2026

Project Overview
This project focused on bringing an aging commercial facility up to modern capacity and code requirements. Our electricians upgraded the main distribution panel, installed three-phase circuits for heavy equipment, and rewired every workspace with minimal disruption to daily operations.


Project Challenge
The facility's aging electrical infrastructure could not support new equipment loads, and outdated panels were creating capacity and safety concerns across multiple workspaces.

Our Solution
We upgraded the main distribution panel, installed dedicated three-phase circuits for heavy machinery, and rewired affected workspaces in coordinated phases to keep the facility operational throughout the project.
Services Included
Main Panel Upgrade
Three-Phase Power Distribution
Workspace Rewiring
Load Capacity Assessment
Emergency Lighting Circuits
Equipment Circuit Installation
Compliance Documentation Review
Electrical Safety Inspection
Final Performance Testing
Project Highlights
Upgraded Main Distribution
Replaced the aging main panel with a higher-capacity distribution system for the whole facility.
Three-Phase Power
Installed dedicated three-phase circuits to safely power heavy commercial equipment.
Phased Rewiring
Rewired each workspace in coordinated phases to avoid disrupting daily operations.
Code-Compliant Capacity
Brought the entire facility up to current code requirements with room for future growth.



Daniel Whitfield
Facility Manager
Electrio managed a complex upgrade across our entire facility without shutting us down for a single day. The new system has completely eliminated our capacity issues.
Related project
NEWSLETTER SUBSCRIPTION
Stay connected with expert electrical tips
No spam. Unsubscribe anytime.
